The Situation
Our customer owned a large commercial office building and they were struggling with high repair costs and significant downtime due to their aged HVAC equipment. This customer had already postponed the decision to replace their equipment because this project posed financial challenges and they needed to remain in operation during the project.
Our Approach
We developed an innovative modular installation strategy that utilized the building's existing freight elevators for equipment transport. This approach eliminated the need for expensive exterior modifications while maintaining building operations throughout the installation process.
The Work
- Installation of modular 80-ton self-contained AC system
- Transportation of equipment modules via building freight elevators
- Integration with existing building infrastructure
- Comprehensive system testing and commissioning
- Staff training on new equipment operation
Special Coordination Requirements
The modular approach required precise coordination of equipment delivery and installation sequences. Our team worked with building management to schedule elevator access during off-peak hours to minimize disruption to building occupants.