Central Plant Re-Design

Complete modernization of 1960s-era distribution center central plant with enhanced efficiency and redundancy while maintaining operations.

Client

Large National Retailer

Location

Regional Distribution Center

Project Type

Central Plant Modernization

Facility Type

Distribution Center (Originally commissioned in the 1960s)

The Situation

Our customer, a large national retailer, was operating an old Distribution Center which was initially commissioned in the late 1960s. Due to the age of this facility and equipment, the company was struggling with high repair costs and significant downtime. They needed a complete redesign of their chilled water cooling and hot water heating systems.

Our Approach

Our team developed a comprehensive redesign that included replacement of primary chilled water, condenser water, and hot water heating pumps with new variable speed pumps. The solution also required replacement of the existing 600-ton crossflow cooling tower with a new 850-ton counterflow cooling tower.

The Work

  • Complete redesign of hot water heating piping system
  • Installation of three new 900-MBH high efficiency boilers
  • Configuration in primary/secondary loop system
  • Installation of 600-ton variable speed primary chiller
  • Addition of 250-ton variable speed secondary chiller
  • Replacement of cooling tower with larger, more efficient unit
  • Comprehensive controls integration and commissioning

Special Coordination Requirements

The project required careful phasing to maintain distribution center operations throughout the construction period. Our team coordinated with warehouse operations to ensure minimal impact on shipping and receiving activities.

Key Challenges

  • Aging 1960s-era central plant infrastructure
  • High maintenance costs and frequent equipment failures
  • Significant operational downtime affecting distribution operations
  • Need for complete system redesign while maintaining operations
  • Requirements for improved efficiency and redundancy

Our Solution

  • Designed custom central plant solution to reduce operational downtime
  • Provided enhanced system redundancy for critical distribution operations
  • Achieved greater efficiency than existing 1960s-era equipment
  • Enabled continuous distribution center operations during construction
  • Met all customer objectives within project timeline and budget

The Results

First, our team designed a project which enabled the ongoing operation of this facility while we made the necessary upgrades. Our plan met all the customer's objectives for this central plant upgrade. We achieved their necessary heating and cooling requirements while maintaining the project's timeline and budget, to the great satisfaction of our customer.

Let's Talk About Your Project

Contact Mechanical

Email: info@malloryandevans.com

Phone (24/7 Emergency): (404) 297-1007

Address: 646 Kentucky St, Scottdale, GA 30079

Office Hours

Monday - Friday: 8:00 AM - 6:00 PM EST

Built with purpose.
Executed with precision.