The Situation

First, our team had to install several new sensors which were needed for the added features of the control panel. This work included drilling and tapping into new sensor wells. We installed and integrated the MCS panel to the chiller and we were able to eliminate the antiquated start pot overloads along with mechanical transition timers within the starter cabinet.

Our Approach

We designed a comprehensive retrofit that converted the existing high-temperature system to a modern, efficient low-temperature variable flow system. The new design provided improved efficiency while maintaining the ability to serve the existing building infrastructure.

The Work

Special Coordination Requirements

The upgrade required coordination with building operations to minimize disruption to office tenants. Work was scheduled during off-peak hours and phased to maintain building comfort throughout the installation process.

Key Challenges

Our Solution

The Results

Our controls and services teams were able to successfully control all chiller functions as well as integrate the MCS panel into the building automation system. This project was a huge success and our customer has a new control panel plus the ability to monitor their chiller remotely with better control and visibility from the BAS.