Large County School System

Complete HVAC system replacement in 7-week summer window with zero disruption to fall semester operations

CLIENT
Large County School System

LOCATION
Georgia

PROJECT TYPE
HVAC System Replacement

FACILITY TYPE
High School Campus

The Situation

This large county school system had one of their largest high schools that needed major HVAC upgrades to a 35-year-old system. The project presented multiple logistical challenges including the need to remove and replace a significant amount of steel and copper piping located above ceilings, re-insulate the pipe, and have it operational in just 7 weeks during the summer break.

Our Approach

We developed a phased execution plan that maximized the limited summer window while ensuring all systems would be fully operational before students returned. Our team coordinated closely with the school district’s facilities management to minimize disruption to other summer activities.

The Work

Special Coordination Requirements

The project required careful coordination with the school’s summer programs and maintenance activities. All major equipment installation was scheduled during specific windows to avoid conflicts with ongoing educational activities and facility maintenance.

Key Challenges

Our Solution

The Results

This Mallory and Evans project was completed under budget in only 7 weeks. By the end of the project, our team had removed and replaced 5 miles of piping throughout the school through additional scope changes. The school system was overjoyed to see it completed early and under budget, ensuring students returned to a fully modernized climate control system.